+
  • 1.11.png

Wet

Wet tail gas treatment equipment consists of a cabinet, a transparent PVC box, Pall rings, a circulating water pump, pipes and valves, etc. The lower part of the PVC box is a water storage tank, and the upper processing section is divided into multiple compartments, which serve as the tail gas washing area.

Category:

Product Description

Product Parameters

Wet tail gas treatment equipment consists of a cabinet, a transparent PVC box, a Pall ring, a circulating water pump, pipes and valves, etc. The lower part of the PVC box is a water storage tank, and the upper processing section is divided into multiple compartments, which serve as the tail gas washing area.

Nadjust the flow rate into the intake chamber through a rotameter and according to the reading of the intake chamber negative pressure gauge. This protects the PVC box, dilutes and purges the process tail gas appropriately, and automatically controls N2 based on the negative pressure value from the negative pressure pressure sensor installed in the intake chamber.The opening and closing of the intake valve. Negative pressure gauges are installed at the inlet and outlet of the process tail gas, which display the pressure difference between the inlet and outlet in real time.

For the PVC box, there is a pipeline connected to the water outlet inside the box for liquid self-draining. (As the installation position of the on-site equipment is at a low terrain, a liquid discharge diaphragm pump is equipped, which is for single use per cup and requires a head of more than 4 meters.) The water storage bin at the bottom is equipped with a liquid leakage sensing alarm.

 

Working Principle Wet
Equipment Model SAWET-600, SAWET-1500
Treatment Capacity 600-1500 LPM
Equipment Size 750*750*1600 mm
Equipment Weight Approximately 300 kg
Power Specification AC380V, 3Phase, 50Hz
Average Power 2 kw